THP HRT Rectification Work

My bedding packed

In this current situation, Bhutan is solely dependent on Hydropower generation for the government to function after the closure of Tourism. Hydropower sectors cannot afford to lose time without generation and every hydropower plant in Bhutan is striving to live up to that standard. Unfortunately, Tala Hydropower Plant (THP), the largest power plant with a generating capacity of 1020MW has got some issues wherein the experts believe to be the issue related to HRT (Head Race Tunnel). A chunk of concrete was found inside the MIV (Main Inlet Valve) to which the decision of dewatering the water conductor system and rectifying was planned.

As part of the manpower arrangement, I was nominated as a site engineer from MHPA. The news came as a surprise for me during the eleventh hour. The notice was circulated on 30th December 2021 that I should report to Tala on 2nd January 2022. For this kind of assignment, an individual needs to have mentally prepared. Anyhow, I take it up as a challenge and want to do my part. I feel there are no better ways/means to serve the nation when in need. This is the first of its kind in our country and this may be the last of its kind. So why not take up the best opportunity in learning new things and meeting new faces.

Surprisingly, I was told to take up my beddings (mattress, blankets) and even to the point of taking our own plates and mugs. That gave me a feeling that I may be dumped in a hall with lots of people where there is a common mess during which we have to make a line for meals. These feelings took me to those times where we prepare for a boarding life. I sincerely packed my clothing, emptied my single bed, and packed my plate/mug/spoon. The weird feeling of leaving Dangdung, my place of stay has given me goosebumps because I don’t know when I will be able to return back, although the schedule for the rectification work on paper is three months.

Nevertheless, this is the call of the nation and all the people of Bhutan are eying on this project, which should be delivered on time or before time. I learned Bhutan is losing a revenue of Nu. 850 Million during this period of shutdown.

I am sure I will discharge my duties diligently and make this project a successful one. For this to happen I urge all my families/friends to pray for the successful completion of the rectification works and to KEN-CHO-SUM I submit my homage for the safety of all those people involved in this project. 